Monday, September 20, 2010

Bathroom blahs: Day 2

Blahs Day 2: Today the plumber showed up early. I truly think he was just as upset as I was about the leak. He promptly assessed the situation and replaced a part (the vertical piece that's in the tank). He said the plastic threads must have cracked and he replaced with a new part that has brass fittings. T from the office brought over a huge dehumidifier by 9:30 am. They assured us that no damage was done to the subfloor, newly installed tile or newly installed heated pad.

We'll see.

No comments: