Sunday, August 22, 2010

Bathroom Remodel

Back in March 2010, the guys installing our geothermal system discovered some leaky pipes in the basement crawl space. Turned out to be from the toilet in our full bathroom on the first floor. It had been leaking for some time. We needed to remediate mold and replace some major components: subfloor, floor covering, toilet and shower. We decided it's time to remodel. This will eventually be the master bathroom.

Bathroom remodel - before photos


No comments: